20th Symposium - Sheraton New Orleans, New Orleans, LA October 7, 2024 - October 10, 2024

20th Symposium Technical Papers

Vertical Lift Bridge Seating Issues – Case Study, Rt 1 & 9T Bridge over Hackensack River

Unionport Bridge Construction of twin single-leaf bascules in a constrained urban site

Three Movable Bridge On-Call Inspections due to Operational Issues

The Giant Magellan Telescope Enclosure

Structural and Mechanical Construction Details for Replacement of a Bascule Span Superstructure with Minimal Impact to Rail & Marine Traffic

Rt. 30 over Beach Thorofare – Rehabilitation of an Historic Complex Single Leaf Bascule Bridge

Bridge-6-Major-Rehabilitation

Bridge-Control-System-Upgrades-Multnomah-County

 Can-Access-be-in-Excess?

CSX-New-River-Bascule-Bridge-Emergency-Coupling-Replacement

Data-Logging-and-Monitoring-Solutions-CSX-CMAR-Automation-Program

Emergency-Response.Bascule-Bridge-Drivetrain-Failure

Enclosed-Gear-Reducers-for-Movable-Bridges-Specification-Considerations

Enclosed-Gear-Reducers-Long-Term-Storage-and-Inspections

Greenville-Yards-Transfer-Bridge

Hamlet-Swing-Bridge-and-Fixed-Bridge-Replacement

Hydraulic-Conversions-of-Movable-Bridges

I-Street-Vertical-Lift-Bridge-Concept-Development-and-Design

Implementation-Considerations-for-Remote-Operation-of-Movable-Bridges

Integrated-3D-Design-for-Heavy-Movable-Structures

Maintenance-of-Wire-Rope-Systems-for-Movable-Structures

Making-Heavy-Architectural-Structures-Move

MBTA-Gloucester-Drawbridge-Constrcution-Challenges-Due-to-Changing-Constraints

Movable-Bridge-Operational-Testing-Strain-Gage-and-Electrical-Load-Readings

Movable-Bridge-Remote-Operation-Best-Practices-CSX-CMAR-Automation-Program

Movable-Bridge-Solutions-with-ACROW-Panel-Bridge-Systems

Norfolk-Southern-Bridge-N-6.66-Rolling-Bascule-Track-Replacement

Noteworthy-Aspects-of-the-East-Michigan-St-Hydraulic-Rehabilitation

Reactivation-of-Veterans-Memorial-Bridge-in-Kaukauna-WI

Rehab-to-the-Trunnion-and-Pinion-Monmouth-County-Bridge-W43

Remote-Bridge-and-Lock-Operation

Remote-Control-Trends-in-Movable-Bridges-Operations-Case-Study

Southwest First Street Bascule Bridge Replacement

Successful Rehabilitation of Movable Bridge Through Design Build Process

Support Machinery Replacement Modifications vs In Kind and Lessons Learned from Two Projects

Temporary Hydraulic Operating System Installation Challenges and Construction Usage

Union Pacific Railroad West Colton Yard Transfer Table Replacement

Wireless-Local-Station-for-Bridge-Control