20th Symposium - Sheraton New Orleans, New Orleans, LA October 7, 2024 - October 10, 2024
20th Symposium Technical Papers
Vertical Lift Bridge Seating Issues – Case Study, Rt 1 & 9T Bridge over Hackensack River
Unionport Bridge Construction of twin single-leaf bascules in a constrained urban site
Three Movable Bridge On-Call Inspections due to Operational Issues
The Giant Magellan Telescope Enclosure
Rt. 30 over Beach Thorofare – Rehabilitation of an Historic Complex Single Leaf Bascule Bridge
Bridge-Control-System-Upgrades-Multnomah-County
CSX-New-River-Bascule-Bridge-Emergency-Coupling-Replacement
Data-Logging-and-Monitoring-Solutions-CSX-CMAR-Automation-Program
Emergency-Response.Bascule-Bridge-Drivetrain-Failure
Enclosed-Gear-Reducers-for-Movable-Bridges-Specification-Considerations
Enclosed-Gear-Reducers-Long-Term-Storage-and-Inspections
Greenville-Yards-Transfer-Bridge
Hamlet-Swing-Bridge-and-Fixed-Bridge-Replacement
Hydraulic-Conversions-of-Movable-Bridges
I-Street-Vertical-Lift-Bridge-Concept-Development-and-Design
Implementation-Considerations-for-Remote-Operation-of-Movable-Bridges
Integrated-3D-Design-for-Heavy-Movable-Structures
Maintenance-of-Wire-Rope-Systems-for-Movable-Structures
Making-Heavy-Architectural-Structures-Move
MBTA-Gloucester-Drawbridge-Constrcution-Challenges-Due-to-Changing-Constraints
Movable-Bridge-Operational-Testing-Strain-Gage-and-Electrical-Load-Readings
Movable-Bridge-Remote-Operation-Best-Practices-CSX-CMAR-Automation-Program
Movable-Bridge-Solutions-with-ACROW-Panel-Bridge-Systems
Norfolk-Southern-Bridge-N-6.66-Rolling-Bascule-Track-Replacement
Noteworthy-Aspects-of-the-East-Michigan-St-Hydraulic-Rehabilitation
Reactivation-of-Veterans-Memorial-Bridge-in-Kaukauna-WI
Rehab-to-the-Trunnion-and-Pinion-Monmouth-County-Bridge-W43
Remote-Bridge-and-Lock-Operation
Remote-Control-Trends-in-Movable-Bridges-Operations-Case-Study
Southwest First Street Bascule Bridge Replacement
Successful Rehabilitation of Movable Bridge Through Design Build Process
Support Machinery Replacement Modifications vs In Kind and Lessons Learned from Two Projects
Temporary Hydraulic Operating System Installation Challenges and Construction Usage
Union Pacific Railroad West Colton Yard Transfer Table Replacement